Borly Hydrometallurgical Complex

A cathode copper plant using heap leaching and SX-EW — a full-cycle project from design to commissioning.

Client
Irkaz Metal Corporation LLP
Region
Karaganda region, Aktogay district
Years
2021–2026
Capacity
5,000 t of cathode copper per year
Scope of work
Design, general contracting, designer and technical supervision
Status
Phase 1 in operation; phases 2 and 3

Atlas Group’s largest project — a hydrometallurgical complex producing cathode copper at the Borly deposit in Karaganda region.

Technology

Heap leaching of copper ore followed by solvent extraction and electrowinning (SX-EW). The product is high-purity cathode copper; capacity is 5,000 tonnes per year.

Atlas Group scope

  • design of the complex and adaptation of process solutions to Kazakhstan codes;
  • general contracting;
  • designer and technical supervision.

Phases

Phase 1 was built in 2021–2022 and is in operation. Phase 2 was delivered in 2022–2023 and phase 3 in 2025–2026.

Get a consultation

Let’s discuss your project

Leave your contact details — an engineer will call you back, clarify the scope and prepare a proposal.

+7 771 210 17 17

By clicking the button you agree to our privacy policy.