Design is the first stage of construction. It covers everything from collecting input data to issuing working drawings. The design technology and sequence depend on the purpose of the facility.
Design work includes
- collecting and analysing data on the future facility, the site and key technical and economic indicators;
- architectural, structural, MEP and process solutions, special sections and cost estimates;
- preparing the document package for state review and construction;
- working drawings describing every element of buildings and structures.
Design disciplines
Master plan, architecture and interiors, structures, process design, heating and ventilation, thermal engineering, heat networks, water supply and sewerage, power supply and instrumentation, external utilities, roads and railways, industrial safety, environmental impact assessment, construction management plan, cost estimates.
Why us
- Category I design licence — we design facilities of any complexity;
- experience designing plants with foreign technology and adapting foreign designs;
- our designers work alongside the group’s builders, so every solution is checked for constructability and cost;
- payment on completion of milestones.