How to Pass State Design Review in Kazakhstan: Stages, Timing and Common Comments

A positive expert review conclusion is required before construction of most facilities in Kazakhstan can begin. How well the design is prepared determines the schedule of the whole investment project.

What the review checks

The comprehensive expert review checks compliance of design solutions with Kazakhstan building codes (SN RK, SP RK), technical regulations, sanitary and environmental standards, fire and industrial safety requirements, and the justification of the estimated cost.

Stages

  1. Input and permit documentation: land title, architectural planning assignment, technical conditions, survey reports.
  2. Internal design audit — completeness and consistency of all sections before submission.
  3. Submission and review — experts examine the design and issue comments.
  4. Resolving comments — revising documentation and responding to experts.
  5. Conclusion — a positive conclusion opens the way to a construction permit.

Common comments

  • input data (technical conditions, planning assignment) inconsistent with design solutions;
  • incomplete survey reports;
  • contradictions between design sections;
  • unjustified equipment and material prices in estimates;
  • insufficient fire safety and environmental sections.

How to shorten the timeline

The key is thorough preparation before submission. An independent expert audit removes most comments in advance. Atlas Engineering Group carries out such audits and supports designs through review until a positive conclusion.

Get a consultation

Let’s discuss your project

Leave your contact details — an engineer will call you back, clarify the scope and prepare a proposal.

+7 771 210 17 17

By clicking the button you agree to our privacy policy.