The detailed design is the main document for construction and permits. We develop design and cost estimate documentation for all disciplines and support it until a positive state review conclusion.
Scope of documentation
- master plan and landscaping;
- architecture and interiors;
- reinforced concrete and steel structures;
- process design;
- HVAC, thermal engineering, heat networks;
- water supply and sewerage;
- power supply, lighting, instrumentation and automation;
- external utilities, roads and railways;
- industrial and fire safety, environmental impact assessment;
- construction management plan;
- cost estimates.
How we work
- We study the input data and design brief and carry out surveys if needed.
- We agree key technical solutions and cost with the client.
- We develop design sections and estimates and run an internal check.
- We support the state review and resolve comments promptly.
- We issue working drawings and provide designer supervision on site.
Frequently asked questions
How long does detailed design take?
For a typical production building — 2 to 4 months; for a large industrial facility — from 6 months. Deadlines are fixed in the contract.
Do you design in one or two stages?
Both: a single-stage working design or a design plus working drawings, depending on the complexity of the facility and the client’s requirements.
Can you complete another designer’s project?
Yes. We audit third-party documentation, resolve state review comments and revise design sections.