Foreign investors often come with a proven technology and a design developed to the codes of their home country — China, Europe, the USA, Russia or Turkey. To build in Kazakhstan, the design must be adapted to SN RK and SP RK requirements and pass state review.
Adaptation includes
- translation of design documentation into Russian;
- review of the foreign documentation for compliance with Kazakhstan’s technical codes;
- recommendations based on the review;
- revision of the foreign design documentation;
- development of special technical conditions (STU);
- support with certification and permits for process equipment and materials;
- technical, organisational and consulting support for foreign designers.
Experience
We designed and built a hydrometallurgical complex using heap leaching and SX-EW technology and a plant for treating oily waste with imported equipment. We work with documentation in English and Chinese and coordinate foreign designers and suppliers.
Frequently asked questions
Can a facility in Kazakhstan be built to a Chinese design?
Yes, but the design must be adapted to Kazakhstan codes, translated and pass state review. Equipment must have proof of conformity with technical regulations.
How long does adaptation take?
From 1 to 4 months depending on the volume of documentation and the number of deviations from Kazakhstan codes.
Do you contract directly with foreign companies?
Yes. We sign contracts with foreign clients and correspond in English and Chinese.