Pre-Design Work and Engineering Surveys

Reliable input data for design: site, utility connection conditions, geodetic and geotechnical surveys, surveys of existing buildings.

Pre-design work is one of the most important stages. Mistakes in input data are the most expensive: they lead to redesign, review comments and higher construction costs.

Scope

  • technical and economic calculations and technology selection;
  • site or route selection;
  • land allocation documents;
  • obtaining technical conditions for utility connections and road or railway access;
  • condition surveys of existing buildings for reconstruction projects;
  • measured drawings of existing facilities;
  • topographic and geodetic surveys;
  • geotechnical surveys;
  • design brief preparation.

Result for the client

Confidence in the chosen technology, an economically justified solution and a complete set of land and utility documents — everything needed to start design without delays.

Frequently asked questions

How long do engineering surveys take?

For an industrial site, usually 3–6 weeks depending on area, season and drilling volume. We state the exact timeline in our proposal after reviewing the input data.

Can I order surveys without design?

Yes. Surveys are available as a stand-alone service; our reports can be used by any designer and by the state review.

Do you help with utility connection conditions?

Yes, we prepare and submit applications for power, water, gas and heat connections and road access, and follow them through to issue.

Get a consultation

Let’s discuss your project

Leave your contact details — an engineer will call you back, clarify the scope and prepare a proposal.

+7 771 210 17 17

By clicking the button you agree to our privacy policy.